Jeddah Waterfront
Main video
Engineering Report
Detected changes
Commencement of reinforced concrete pouring operations with Everdigm concrete pumps and transit mixers on-site
Application of waterproofing layers (black bitumen) over extensive areas of plain concrete
Installation of wooden formwork for retaining walls and perimeter ground beams across the site
Progress reading
The visual evidence aligns with the recorded increase in the foundations category (+11%), as work has progressed from the insulation and steel reinforcement phase observed in the previous visit to the actual reinforced concrete pouring phase, explaining the jump in the completion rate.
vs previous visit
Compared to the visit on 2026-03-08, we observe the site's transition from the reinforcement steel preparation phase for the entire area to the partial pouring phase. Previous images showed a dense reinforcement steel mesh covering the site, while current images show the progress of pouring works and the clearer emergence of column necks and ground beams, with active pouring equipment present.
Expected next milestones
Completion of all footings and ground beams casting, commencement of backfilling around the foundations, and preparation for the ground floor concrete works.